The PMCI standards
Our pool construction specifications start with a professional design and job specific engineering.
We then add years of knowledge and our heartfelt dedication to build the best pool.
We then add years of knowledge and our heartfelt dedication to build the best pool.
We have successfully managed to change, adapt and evolve with the times, while maintaining a strong and solid connection to the principles and values that define and make us who we are. Our promise to you is to deliver the best product we are capable of building, maximizing your return on investment. Being honest and transparent, we strive to build a positive relationship with you, so that you will share your good experience with others, which is our only form of advertisement.
Our construction standards align and or exceed the local building codes specific to the job site location.
Here are some of the details that make us different than the rest
* Mechanically compacted rock base floor for greater gunite tank ground support and stability
* Pre plumbed main drain , skimmer, return lines and safety vent
* All shell plumbing fully encased in gunite (no through holes on gunite shell)
* High grade reinforcing with #3 steel rebar, tied 11” on center
* Gunite shell, 4000 PSI
* 3” main drain suction line
* 2” dedicated vacuum line
* 2" pool return lines
* Never lube valves
* All plumbing lines are PVC schedule 40, chemically welded
* All plumbing lines pressure tested to 40psi throughout the construction process
* Lifetime warranty on all underground plumbing
* Pool coping professionally cut and installed to exact pool dimensions with even, minimal grout joints or cero grout
* Waterline tile professionally installed with latex modified mortar
* Deck perimeter reinforced with concrete footer with #5 steel as per required on job specific engineering, to adequately support an attached screen enclosure
* Paver decking installed over compacted crushed concrete base product
* Deck drain system with removable fascia for periodic maintenance cleaning
* Exposed aggregate interior finish, theme color coordinated
* All equipment installed with screw unions for ease of maintenance, repair and replace
* On the job training on how to operate and maintain your pool once completed
* Customer folder with all pertinent documents and maintenance instructions
Here are some of the details that make us different than the rest
* Mechanically compacted rock base floor for greater gunite tank ground support and stability
* Pre plumbed main drain , skimmer, return lines and safety vent
* All shell plumbing fully encased in gunite (no through holes on gunite shell)
* High grade reinforcing with #3 steel rebar, tied 11” on center
* Gunite shell, 4000 PSI
* 3” main drain suction line
* 2” dedicated vacuum line
* 2" pool return lines
* Never lube valves
* All plumbing lines are PVC schedule 40, chemically welded
* All plumbing lines pressure tested to 40psi throughout the construction process
* Lifetime warranty on all underground plumbing
* Pool coping professionally cut and installed to exact pool dimensions with even, minimal grout joints or cero grout
* Waterline tile professionally installed with latex modified mortar
* Deck perimeter reinforced with concrete footer with #5 steel as per required on job specific engineering, to adequately support an attached screen enclosure
* Paver decking installed over compacted crushed concrete base product
* Deck drain system with removable fascia for periodic maintenance cleaning
* Exposed aggregate interior finish, theme color coordinated
* All equipment installed with screw unions for ease of maintenance, repair and replace
* On the job training on how to operate and maintain your pool once completed
* Customer folder with all pertinent documents and maintenance instructions
"The way to get started is to quit talking and begin doing."
-- Walt Disney
-- Walt Disney